Matalan Bridge - Kent
Client: Network Rail
Project Overview
-
This was an 1800mm wide KITEStep which replaced a very poor 900mm access.
-
The KITEStep solution included a 5.4m change of direction landing to enable a safe access that worked successfully around the existing ground contours.
-
The new system avoided any significant excavation and utilised existing concrete steps for some of the fixing points.