Matalan Bridge - Kent

Client: Network Rail

​Project Overview

 

  • This was an 1800mm wide KITEStep which replaced a very poor 900mm access.

  • The KITEStep solution included a 5.4m change of direction landing to enable a safe access that worked successfully around the existing ground contours.

  • The new system avoided any significant excavation and utilised existing concrete steps for some of the fixing points.

KITEStep

Littleton Lane

Nr. Sparsholt

Winchester 

Hampshire 

SO21 2LS

KITEStep - Permanent Embankment Access.

  • KITEStep LI Page

© 2020 by KITE

VAT Registration Number: 101630965